Good Medicine: Healing a Hospital’s Struggling ED

A 205-bed general medical and surgical hospital in a medically underserved community in Chicago was struggling with an underperforming emergency department (ED). Higher-than-normal volume left patients waiting more than two hours to be seen by a doctor and almost eight hours to be admitted. Nearly 8 percent left without being treated at all. The poor experience resulted in patient satisfaction scores in the 4th percentile, and dragged down overall hospital performance.

The parent network had recently revamped operations at another hospital’s ED and decided to try a similar approach at the hospital in question. They brought in Integrated Project Management, Inc. (IPM) to organize and orchestrate an ED optimization program.

IPM met with the ED medical director and hospital chief nursing executive to assess the current situation. The goal was to reduce delays in key performance areas, including the ED’s “left without treatment” (LWOT) numbers and increase patient satisfaction levels.

Using a two-phased approach and close collaboration with the hospital team, IPM first led a short engagement to determine the scope of the initiative, identify and prioritize projects within the program, estimate their size, and confirm team members. The second phase involved leading the project teams to prepare the detailed plans and implement them and ultimately, help get the stressed ED on track.

The process resulted in a complete redesign of the ED structure, from adding an RN and care provider to the triage area, to expanding the floor design with an additional nurses’ station.

Instead of assigning individual nurses to a block of rooms, the new structure created teams of doctors, nurses, and techs (named the “blue” and “red” teams) who would provide care for a designated area. The team model focuses on patient safety and allowed for proper staffing ratios throughout the ED. Other changes included modifying workflow (e.g., establishing the “fast track” rooms next to triage), improving the organization and location of supplies, and changing metric tracking and communication.

Over the course of three months, the teams were already implementing improvements. IPM led change management efforts to ensure employee awareness and engagement by encouraging them to voice their thoughts in project teams and a continuous improvement committee. After using their input to plan and implement training, the team was confident in the go-live date for the team care model.

The results were almost immediately evident in the key metrics. By November 2015, the length of stay (LOS) for admitted patients had dropped by an hour and a half, LWOT rate had declined from 7.5 percent to 4.2 percent, and patient satisfaction scores increased from 4 percent to 7 percent.

Those results are just the start of the ED’s healing process. The hospital’s medical director has stated that progress was faster than he thought possible and was completed three months faster than it had been implemented at the other hospital—the benchmark model. And thanks to an engaged staff and leadership team, the changes were sustained four months after IPM’s engagement and continue to position the hospital for success.

Stay in the Know
Subscribe to receive IPM's Managed Right newsletter and industry insights.

"*" indicates required fields

By submitting this form, you agree to receive our newsletter and occasional messages from IPM. You can opt out anytime. View our full Privacy Policy.

Related Service

Related Industry

Related Insights

Perspective

Uncovering Value in Complex Manufacturing

Perspective

Culture: Understood Yet Often Ignored by Leadership

SEE ALL INSIGHTS
Project leadership is our core competency.
For more than 30 years, companies have relied on IPM to lead and sucessfully complete their complex and critical projects.